missing translation for 'onlineSavingsMsg'
Learn More

Unity Lab Services™ Start-up Service (Stackable Shakers)

New equipment start-up service for stackable shakers (covers all units); Equipment is required to be final assembled and stacked in place prior to this service

Brand:  Unity Lab Services™ STARTSSHAK

Product Code. 17859592

  • 695.00€ / Each
Estimated Shipment: 17-12-2024
to see stock.
Explore more special offers
Add to basket

Alert:

Assembly, set-up, and started-up as per user manual is a requirement to maintain warranty.

This item is not returnable. View return policy

Description

Description

  • The appliance must be unpacked and installed in its place of use, by the customer, before the technician arrives; excludes major assembly (stacking of heavy CO2 incubators and shakers, assembly of biosafety cabinet stands and positioning cabinet on stands)
  • Includes certification of biosafety cabinets for NSF 49 in US and EN12469 in Europe; in UK, an appropriate KI test (BSCKI15S or BSCKI18L) must be added
  • Customer should ensure that site is properly prepared, ahead of time, including supply sources and connections
  • Includes travel and labor unless extensive travel is needed
  • All additional works, as i.e. waiting time or correctional works, will be invoiced additionally according to our recent valid service pricelist

Thermo Fisher Scientific engineer will perform the following tasks, upon arrival, depending on the specific equipment:

  • Check that the equipment has been handled and assembled as per the user manual
  • Check for proper clearances from obstacles, walls, other equipment, doorways, windows, air vents, and source of excessive light, heat, air flow
  • Stabilize, balance, anchor, connect to pre-installed wall mounts (excluding seismic anchors) with the appropriate hardware
  • Ground, and connect to the proper power supply and other equipment suits via proper connections
  • Connect to flammable and pressured gas sources, tanks, water source, with proper fittings, lines, tubing and other hardware
  • Execute manufacturer’s user manual instructions
  • Connect factory-installed safety devices such as alarms, back-up systems
  • Ensure that keypad, controls, service menu and user interface are working
  • Setup of user operating profiles
  • Explain operating, maintenance and cleaning requirements and procedures
  • Explain warranty and service plan options
  • Review annual preventative maintenance purchase options and schedule it appropriately
TRUSTED_SUSTAINABILITY
Specifications

Specifications

Stackable Shakers
1 Day
Service
Start-up Service
Product Suggestions

Product Suggestions

Videos
SDS
Documents

Documents

Certificates
Special Offers

Special Offers

Product Content Correction

Your input is important to us. Please complete this form to provide feedback related to the content on this product.

Product Title

By clicking Submit, you acknowledge that you may be contacted by Fisher Scientific in regards to the feedback you have provided in this form. We will not share your information for any other purposes. All contact information provided shall also be maintained in accordance with our Privacy Policy.

Thank You! Your feedback has been submitted. Fisher Scientific is always working to improve our content for you. We appreciate your feedback.

New quipment has to be fully assembled in operating position ready to be turned on prior start-up service.